Skip to content

Logistics

Construction logistics and heavy transport in Bangladesh

Moving the plant, the steel and the project cargo that a site cannot start without — low-beds, trailers, port handling and covered transport, anywhere in the country, on the same contract as the equipment.

Low-bed
40 ft
Dump trucks
10-wheel
Water trucks
to 20,000 L
Coverage
Nationwide

What we move

Heavy, wide, awkward — and on time.

Heavy and over-dimensional transport anywhere in Bangladesh — low-beds, trailers, port handling and project cargo.

  • 40 ft low-bed trailers for tracked plant
  • Structural steel, pipe and project-cargo haulage
  • Port and jetty heavy-lift coordination
  • Covered fleet for sensitive and high-value consignments

Tracked plant does not drive itself to site. A 200-tonne crawler crane arrives as a convoy of low-beds; an excavator arrives chained to a trailer; a concrete pump truck drives, but the stationary pump behind it does not. We run that movement for our own fleet and for our clients' — the same operators, the same route planning, the same escort and permit work.

Beyond plant, we haul what projects consume: structural steel, pipe, bricks, sand and stone by the lakh cubic feet, and project cargo off the quay at port. On the Dhaka–Sylhet highway that meant a sub-contract for carrying sand and stone by dump truck along the whole alignment; at Matarbari and Padma it meant heavy lift at the jetty.

Haulage and site-services fleet

Dump truck
TATA / Ashok Leyland, high body, 10 wheels
Low-bed trailer
40 ft
Water truck
10,000 L
Water truck
13,000 L
Water truck
15,000 L
Water truck
20,000 L

Something heavy to move?

Send the dimensions, the weight, where it is and where it needs to be. We will come back with a route, a vehicle and a date.